2023.09.12

First tower crane installed at OPUS site

The first tower crane has been installed at the OPUS club residence construction site. On the area of more than 1000 m², foundation slab construction works are in progress. The concrete base and waterproofing for the foundation slab is being installed on an area of more than 3000 m².

On the OPUS business centre construction site, the excavation fencing works are 85% complete. Earthworks are 35% complete.

The construction is being carried out in accordance with the schedule.